Main Pain Points
Before automation, the project faced these operational pressures.
- Flat and irregular items previously required repeated handling
- Limited space and frequent manual intervention or workflow changes

EXPRESS · 3D SORTER E
A domestic express hub handles flat and irregular items in limited space while reducing process changes.

Project Story
Before automation, the project faced these operational pressures.
Tegene configured the solution around site flow, parcel profile and throughput goals.
03 / RESULT
After the equipment and workflow were implemented, the project delivered clear gains in capacity, staffing or process coordination. Key figures are summarized above.
Useful for similar industry customers, system integrators and warehouse operators evaluating sortation automation.
If this project looks like yours, having site space, volume, parcel profile and system interface details ready makes it much faster to size the equipment.
Next Step
Share your industry, site, parcel profile and peak volume to compare against similar projects and clarify fit.
Assess a Similar Project